
1926 bungalow fuse box conversion
Screw-in fuses and a cloth-wired basement panel replaced with a 200-amp breaker panel, new grounding electrode system and a labeled directory. Completed and signed off by the inspector.
CO Lic. #TBD · Bond #TBD · Bonded & Insured
(303) 000-0000
Panels are hidden equipment, which makes workmanship easy to hide too. Here's what ours looks like once the cover comes off.
Before & after
Same wall, same house, thirty years of difference in safety and capacity.


Recent work

Screw-in fuses and a cloth-wired basement panel replaced with a 200-amp breaker panel, new grounding electrode system and a labeled directory. Completed and signed off by the inspector.

Meter socket, mast and panel replaced ahead of a heat pump install. Xcel disconnect coordinated so the outage window landed inside a single afternoon.

60-amp feeder to a detached garage subpanel with a hardwired 48-amp Level 2 charger, permitted and inspected.

A corroded 100-amp panel in an unconditioned mechanical room replaced like-for-like. The load calculation showed no upgrade was needed, so we didn't sell one.
Representative project photography shown while we build our library of job-site images.
Free on-site estimates across the Denver metro. No phone guesses, no change orders, no upsell to work you don't need.