Skip to main content

CO Lic. #TBD · Bond #TBD · Bonded & Insured

(303) 000-0000

Solar-Ready Electrical Preparation for Colorado Homes

Panel capacity, busbar headroom and pre-piping so a future solar or battery installation lands on a service that can actually accept it.

Busbar and main breaker sized for backfeed
Conduit pre-piped to the array or inverter location
Load calculation done before the solar contract is signed
We prepare the electrical side, not the solar array

Why solar quotes stall at the panel

Solar interconnection has to obey the busbar rating in your existing panel. A 100-amp panel, a full busbar, or a main breaker that leaves no headroom for backfeed will hold up a solar installation no matter how good the array design is. Homeowners usually discover this after the solar contract is signed, which is the expensive order to find out.

Getting the electrical side ready first turns the solar install into a clean, fast job. It also means you are choosing your panel work on its own merits, at a price you compared, rather than as a rushed change order inside somebody else's contract.

  • 100-amp services that cannot accept a meaningful backfeed
  • Panels with no remaining breaker spaces for a solar disconnect
  • Busbar ratings that fail the interconnection calculation
  • Older equipment a solar installer will not tie into
  • Battery plans that need a protected loads subpanel

What solar-ready preparation includes

We run a load calculation, confirm what your service can accept, and lay out the work: a panel or service upgrade if the busbar cannot carry the backfeed, breaker space and a properly rated disconnect location, grounding brought current, and conduit pre-piped from the panel to the inverter or roof penetration point while walls or attics are accessible.

Where a battery is on the horizon, we plan for the protected-loads subpanel now, because retrofitting one later means opening the same walls twice.

  • Panel or service upgrade sized for planned backfeed
  • Breaker space and disconnect location planned to code
  • Conduit and pull strings run to the inverter or array location
  • Grounding and bonding verified and corrected
  • Battery and protected-loads planning where relevant

What we do and what we do not

We prepare the electrical service. We do not sell, design or install solar arrays, and we are not paid by anyone who does. That independence is the point: our recommendation on your panel is not shaped by a solar sale, so if your service is already fine for the array you are considering, we will simply tell you that.

Solar-Ready Electrical Preparation work by Electrical Panels Only

Our process

How an EPO solar-ready prep job runs

  1. 01

    Talk through the solar plan

    Array size, inverter type and whether a battery is in scope all change the electrical answer.

  2. 02

    Load calculation and panel review

    We check busbar rating, main breaker, breaker spaces and grounding against the interconnection math.

  3. 03

    Written scope and price

    Only the work the plan actually requires, priced fixed and in writing.

  4. 04

    Permitted preparation work

    Upgrade, breaker space, disconnect provision and conduit pre-piping completed and inspected.

  5. 05

    Hand-off

    You get the panel details and photos your solar installer will ask for.

Pricing

What moves the price on this job

We quote after seeing the equipment, because these details change the number more than anything else.

  • Whether a service upgrade is required for the backfeed
  • Distance and route from the panel to the inverter location
  • Battery and protected-loads subpanel scope
  • Grounding electrode corrections on older homes
  • Permit and inspection fees

Monthly payments available through Hearth

Prequalifying takes about a minute and uses a soft credit check, so seeing your options does not affect your credit score.

See financing

FAQ

Common questions

Do I need a 200-amp service for solar?

Not always. It depends on your array size, your busbar rating and the interconnection method. Plenty of well-sized 200-amp panels take solar with no work at all, and some 100-amp services can with a smaller array or a supply-side connection.

Should I upgrade before or after signing a solar contract?

Before, if you can. Knowing your electrical scope up front keeps it out of the solar change-order process and lets you compare prices calmly.

Do you install solar panels?

No. We handle the panel, service and conduit preparation, and we work alongside whichever solar contractor you choose.

What is pre-piping?

Running the conduit, and often a pull string, from the panel to where the inverter or array will land, while the path is still accessible. It saves opening finished walls later.

Can you prepare for a battery too?

Yes. Batteries usually need a protected-loads subpanel and a specific interconnection arrangement, and planning that now is much cheaper than retrofitting it.

Still deciding?

The fastest way to get a real answer for your home is to have a tech open the panel. The on-site estimate is free, and you leave with a written price for solar-ready prep.

Want the long version first? Read 100 vs 200 Amp Service: What Your Home Actually Needs.

Get your panel price in writing

Free on-site estimates across the Denver metro. No phone guesses, no change orders, no upsell to work you don't need.